A New Sign - a New Begining


Original sign is a beacon in the night.

Trenches for the bollards and electrical.

Bollard conduit.

Additional bollard trenching.

New sign base forms and conduit trench.

Original sign coming down.

Jack Clapp supervises the unloading.

Jack Neisley does all the work.

David Ketsdever (contractor, and Jack N inspect the erected sign.

John Leonard completes the electrical.

Sign and bollard light the way to Surf City Church.

All lit up!